MISSION GREEN CITY

National Green Tribunal (NGT), Chhattisgarh

Wastewater Management

Population (census 2011)

5,725,973

Current Population (2023)

7,541,638

Current Sewage Generation : Estimated (MLD)

862.9

operational /Under construction STP Capacity (MLD)

410.1

Gap in treatment (MLD)

452.8

Additional STP Required Capacity (MLD)

689.9

The state is generating 600 MLD of Sewage for which 737.5 MLD capacity of STPs are operational and in planning stage for the treatment of used water.

14

Operational (360.50 MLD)

11

Under Construction (87.80 MLD)

9

Planning Stage (323.70 MLD)